1. Design and manufacture according to: API 6D, BS 5351;
2. Connection flange ends according to: ANSI B16.5;
3. Test and inspection according to: API 598.
4. Structure features: trunnion mounted ball;
5. Material conform to : ANSI/ASTM
6. Main Material: A105(N), LF2, F304(L), F316(L), F51, F91, F11, F22, F321, etc.
The trunnion mounted ball valve is designed for extreme pressure environments. Made from ASTM A182 F304 stainless steel, it resists corrosion and maintains structural integrity up to 560°C. With a 2500LB rating, this valve handles pressures up to 3750 psi, making it ideal for oil, gas, and chemical processing systems. Its bare shaft design enables seamless integration with electric or pneumatic actuators for automated control. Equipped with flanged ends per ANSI B16.5, installation is secure and leak-free. Compliant with API 6D and 100% tested per API 598, it guarantees bubble-tight shut-off using soft-seated PTFE seals. Trust SFANVALVE for precision-engineered trunnion mounted ball valves built for performance, durability, and long-term reliability in demanding industrial applications.
| Brand | SFAN VALVE OR "OEM" |
|---|---|
| Flow bore | Reduced bore or Full bore |
| Material | Carbon steel, Stainless steel, Alloy steel or other |
| Dimension | DN10(1/4") to DN1400(56") |
| Class | 150~2500 |
| Medium | Water, oil &gas. |
| Temperature | -196℃(cryogenic design) to 560℃ |
| Valve test | 100% quantity tested before delivery |
| Valve guarantee | 18 months after shipments and 12 months after installed |
| Packing | Plywood or carton cases |
| Delivery time | 7 days to 30 days |
| Place of Origin | Zhejiang, China |




Your questions answered
For Sfanvalve’s standard products, we are willing to start production without any payment in advance. We accept product inspection upon completion, and payment is only due once the inspection is passed. SFAN will then arrange shipment to your designated warehouse as per your requirements.
Yes. After receiving the contract, we will provide technical drawings. Production will commence based on these drawings once they are confirmed by both parties.
After receiving the contract and confirming the drawings, we will provide a production schedule and manufacture strictly according to it. We will provide photos or videos to share and make a record for every stage of the production process. If a serious delay occurs due to management error, we will arrange air shipment and bear all costs by air.”
The warranty period is 18 months from the date of shipment or 12 months from the date of installation, whichever occurs first.