1. Design and manufacture according to: API 6D, BS 5351
2. Connection ends according to:
a) Socket welded dimension according to ANSI B16.11;
b) Screw thread dimension according to ANSI B1.20.1;
3. Test and inspection according to: API 598.
4. Structure features: floating ball;
5. Material conform to : ANSI/ASTM
6. Main Material: A105(N), LF2, F304(L), F316(L), F51, F91, F11, F22, F321, etc.
The forged steel 3 pcs A105 carbon steel ball valve with lock is built for high-pressure, high-security applications in oil, gas, and industrial systems. Made from ASTM A105 forged carbon steel, it features socket weld ends and an 800LB pressure rating, ensuring reliable performance under extreme conditions up to 425°C. Its three-piece design allows easy maintenance without pipeline disassembly, while the lockable lever handle prevents unauthorized operation—essential for safety compliance. Manufactured to API 608 & API 6D and tested per API 598, every valve delivers leak-tight integrity. Whether for refineries or power plants, this forged steel 3 pcs A105 carbon steel ball valve with lock combines durability, serviceability, and security. Trust SFANVALVE for valves engineered to last.
| Brand | SFAN VALVE OR "OEM" |
|---|---|
| Flow bore | Standard bore or Full bore |
| Material | Carbon steel, Stainless steel, Alloy steel or other |
| Dimension | DN10(1/4") to DN100(4") |
| Class | 150~2500 |
| Medium | Water, oil &gas. |
| Temperature | -196℃(cryogenic design) to 560℃ |
| Valve test | 100% quantity tested before delivery |
| Valve guarantee | 18 months after shipments and 12 months after installed |
| Packing | Plywood or carton cases |
| Delivery time | 7 days to 30 days |
| Place of Origin | Zhejiang, China |
Your questions answered
For Sfanvalve’s standard products, we are willing to start production without any payment in advance. We accept product inspection upon completion, and payment is only due once the inspection is passed. SFAN will then arrange shipment to your designated warehouse as per your requirements.
Yes. After receiving the contract, we will provide technical drawings. Production will commence based on these drawings once they are confirmed by both parties.
After receiving the contract and confirming the drawings, we will provide a production schedule and manufacture strictly according to it. We will provide photos or videos to share and make a record for every stage of the production process. If a serious delay occurs due to management error, we will arrange air shipment and bear all costs by air.”
The warranty period is 18 months from the date of shipment or 12 months from the date of installation, whichever occurs first.