APPLICATION STANDARDS:
1. Design and manufacture according to: API 6D, BS 5351
2. Connection ends according to:
a) socket welded dimension according to ANSI B16.11;
b) screw thread dimension according to ANSI B1.20.1;
3. Test and inspection according to: API 598.
4. Structure features: floating ball;
5. Material conform to : ANSI/ASTM
6. Main Material: A105(N), LF2, F304(L), F316(L), F51, F91, F11, F22, F321, etc.
The 2-piece forged stainless steel ball valve delivers reliable shut-off in high-pressure, corrosive systems. Made from ASTM A182 F316 stainless steel, it resists rust, acids, and chlorides, with temperatures up to 870°C. Its two-body design enables easy maintenance without pipeline removal, while socket weld ends ensure secure installation. Rated at 600LB, this valve complies with API 607 and is 100% tested per API 598. The soft-seated ball mechanism ensures zero leakage under normal conditions. Ideal for chemical, pharmaceutical, and food & beverage applications. Trust SFANVALVE for precision-engineered 2-piece forged stainless steel ball valves built for performance and safety.
| Brand | SFAN VALVE OR "OEM" |
|---|---|
| Flow bore | Standard bore or Full bore |
| Material | Carbon steel, Stainless steel, Alloy steel or other |
| Dimension | DN10(1/4") to DN100(4") |
| Class | 150~2500 |
| Medium | Water, oil &gas. |
| Temperature | -196℃(cryogenic design) to 560℃ |
| Valve test | 100% quantity tested before delivery |
| Valve guarantee | 18 months after shipments and 12 months after installed |
| Packing | Plywood or carton cases |
| Delivery time | 7 days to 30 days |
| Place of Origin | Zhejiang, China |

Your questions answered
For Sfanvalve’s standard products, we are willing to start production without any payment in advance. We accept product inspection upon completion, and payment is only due once the inspection is passed. SFAN will then arrange shipment to your designated warehouse as per your requirements.
Yes. After receiving the contract, we will provide technical drawings. Production will commence based on these drawings once they are confirmed by both parties.
After receiving the contract and confirming the drawings, we will provide a production schedule and manufacture strictly according to it. We will provide photos or videos to share and make a record for every stage of the production process. If a serious delay occurs due to management error, we will arrange air shipment and bear all costs by air.”
The warranty period is 18 months from the date of shipment or 12 months from the date of installation, whichever occurs first.