1. Design and manufacture according to: ASME B16.34
2. Connection ends according to:
a) Socket welded dimension according to ANSI B16.11;
b) Screw thread dimension according to ANSI B1.20.1;
3. Test and inspection according to: API 598.
4. Structure features: floating ball;
5. Material conform to : ANSI/ASTM
6. Main Material: Carbon steel, stainless steel, alloy steel etc.
The 2-pieces stainless steel ball valve is engineered for reliable shut-off in industrial and commercial systems. Made from corrosion-resistant 304 stainless steel, it features a 1-inch threaded connection and 1000 WOG pressure rating, making it ideal for water, oil, gas, and steam applications. Its two-piece body design allows for easy maintenance and seal replacement without pipeline disassembly—perfect for high-maintenance environments. Equipped with a manual lever handle, it ensures quick, secure operation with clear ON/OFF indication. Every valve is manufactured to ASME B16.34 standards and tested per API 598. Whether you need durability or serviceability, this 2-pieces stainless steel ball valve delivers performance and value. Trust SFANVALVE for precision-engineered valves that meet global specifications.
| Brand | SFAN VALVE OR "OEM" |
|---|---|
| Flow bore | Reduced bore or Full bore |
| Material | Carbon steel, Stainless steel, Alloy steel or other |
| Dimension | DN10(1/4") to DN100(4") |
| Class | 1000(PSI) |
| Medium | Water, oil &gas. |
| Temperature | -20℃ to 180℃ |
| Valve test | 100% quantity tested before delivery |
| Valve guarantee | 18 months after shipments and 12 months after installed |
| Packing | Plywood or carton cases |
| Delivery time | 7 days to 30 days |
| Place of Origin | Zhejiang, China |
Your questions answered
For Sfanvalve’s standard products, we are willing to start production without any payment in advance. We accept product inspection upon completion, and payment is only due once the inspection is passed. SFAN will then arrange shipment to your designated warehouse as per your requirements.
Yes. After receiving the contract, we will provide technical drawings. Production will commence based on these drawings once they are confirmed by both parties.
After receiving the contract and confirming the drawings, we will provide a production schedule and manufacture strictly according to it. We will provide photos or videos to share and make a record for every stage of the production process. If a serious delay occurs due to management error, we will arrange air shipment and bear all costs by air.”
The warranty period is 18 months from the date of shipment or 12 months from the date of installation, whichever occurs first.